Hygienic piping


industrial projects


MECHANICAL , ELECTRICAL & INSTRUMENTATION AND FACTORY RELOCATION


EPC Contracting - Execution of Turnkey projects comprising design, procurement, engineering, fabrication, installation, testing and commissioning with necessary Govt. or other authority approval.

Mechanical Division - Detailed Scope of Work


Design & Engineering

❖  Design of piping and pipelines

❖  Design of Tanks

❖  Design of skids

❖  Structural Design

❖  Stress Analysis

Piping Works

❖  Compressed Air piping

❖  Chilled water piping

❖  Double jacketed piping

❖  Hygienic/Food grade piping

❖  LPG/LNG piping

❖  Lab gas, N2, CO2 piping

❖  Oil and Gas piping

❖  Thermal Fluid, Steam piping

❖  U/G piping

Tank Fabrication

❖  Double skin tanks

❖  Hygienic/Food grade tanks

❖  Oil storage tanks

❖  Pressure Vessels

❖  Storage Silos

Equipment Installation

❖  All kind of static and Rotary Equipment

Special Skids

❖  Process metering skids

Structural Works

❖  Mild steel structures

❖  Stainless steel structures

Electrical Division - Detailed Scope of Work

INDUSTRIAL AUTOMATION

❖   Design & Program PLC control systems

❖   Process automation systems

❖   Process control systems

❖   Solution Consultancy

❖   SCADA & HMI Development

❖   Motion Control - VFDs, Servos, Steppers

❖   Customized Software & Hardware Development

❖   Design & Program PLC control systems

❖   Field to ERP Integration

❖   Process control systems

❖   Remote Telemetry Units (RTUs)

❖   Design & supply PLC Control Panels/RIO Panels

INSTRUMENTATION

❖  Measurement & Controls

❖  Process instruments

❖  Level Instruments

❖  Flow Metering & Flow Computers

❖  Metering Systems

❖  Tank gauging Systems

❖  Selection of Transmitters, Controllers & recorders

❖  Temperature & Pressure transmitters

❖  Field Calibration & Configuration

❖  Cable management

ELECTRICAL

❖   Design, supply & erect LV panels

❖   MDB, MCC, SMDB, APFC Panels

❖   VFD & Soft starter Panels

❖   Cable management - Cable trays & cables

❖   LV Power Cables

❖   Field isolators

❖   Busbar systems

❖   Testing & commissioning

Factory Relocation - Detailed Scope of Work

Dismantling

❖   Demolishing

❖   Tagging & Packing

Permits & Approvals

❖  JAFZA

❖  DEWA

❖  DCD

❖  Trakhees

❖  CED

❖  RTA

❖  DP World

Shutdown Works

❖   Mechanical

❖   Electrical